Over 400 Ancon Tension Bars have been installed on the Forsyth Barr stadium in Dunedin, New Zealand, where England will play their first three matches in the 2011 Rugby World Cup. The steel tension bars are installed in the roof and in the South and West stands of this brand new stadium, to brace the impressive overhead structural steelwork. The Ancon system includes bars with a special, high strength, rolled thread which was designed and tested to meet the specific dynamic conditions in the stadium roof, caused by wind loads. Click here to read more. |