NEW: Ancon Two-Part Wall Tie for Cellular Clay Blockwork
Ancon has developed a Wall Tie to fix traditional brick cladding to an internal leaf of cellular clay blocks with horizontal bed joints of just 1mm.
The new Ancon CCB4 is an innovative two-part Wall Tie, suitable for use in new-build houses and commercial developments. The flat inner section is built into the thin bed joints in the cellular clay blockwork. The cavity width is catered for by the length of the outer wire section, which is hooked into the inner section as work on the external leaf progresses.
This two step installation process eliminates any risk of injury to site workers from wall ties left protruding from the inner leaf.
Ancon has the most comprehensive wall tie range on the market. The Ancon CCB4 Wall Tie complies with BS EN 845-1: 2013 and can be used in line with NHBC standards.
Andrew Lilley, Divisional Sales Manager at Ancon said,
Ancon continues to expand its wall tie range to suit changes in building methods, to comply with the latest European regulations and to help the Industry build safer, faster and more energy-efficient structures.
Latest News
Leviat upgrades Ancon Optima range to provide more economical solutions for single storey lifts and wider cavities
Engineered connection specialist, Leviat, has responded to growing customer requests for a faster and more efficient brickwork support solution for lower loads with the launch of two major new products, Ancon Optima 6 and Ancon Optima 8.
Leviat's Innovation Shines in Shortlisted Projects at Brick Awards
World-leading engineered connections specialist, Leviat, has made a significant impact on the architectural landscape with its innovative solutions playing a key part in the success of nine shortlisted projects at the 48th Annual Brick Awards, the longest and most widely respected design and construction awards in the UK.